|
|
What's In The Box - Central SystemsVent StacksOne of the main tasks is the installation of the vent stack, which is included with all units. The vent kits included in the shipping carton are sufficient for installation in most single story buildings. If more is needed they are normally easy to find. All vent pipes are thin-wall PVC. For more vent stack installation information, click here. Toilet InstallationThe second main task of installing a central unit is the waste piping installation. Click here for full information on how to do this. ElectricalAll electric units are
supplied with a power cord and pre-molded plug which connects to a standard (3)
pin 115 Volt outlet and powers both the fan and heating element.
12 Volt
fans for non-electric models can be installed in-line with the stack, and
connected to a battery which draws from an alternate source of energy, such as a
solar panel. Drains Central units are all fitted with 1" drains, which should be
connected to an approved drain pit, container, or other facility.
Click here for more information on handling excess liquid.
|
Contact Us:
Telephone: toll free at 1-888-810-4709
Parry
Sound,Northern
Ontario,Muskoka and Georgian Bay
Ontario,Canada
© Copyright 2022, STRATEnerGY Inc.™
All Rights Reserved
Caribbean and US |